MARA · Stable: ATM call + put · At the money, wing 1 %
Stable: ATM call + put
Sell one call and one put at the same nearest available common strike K. Buy a call above K and a put below K, with the same expiry. The result includes all four options together.
Target protective strikes: K × (1 + 1%) and K × (1 − 1%). The closest available outward strikes are used; the grid can make the actual wings unequal.
In the option columns, Call and Put identify the contract type. The strike is shown first; the prices below are entry → exit, per share. The single P&L is for the complete four-option set after commissions.
Historical bid/ask model
Contracts and strikes are selected from the chain available that day. At 09:35 New York, short legs sell at bid and long legs buy at ask using the latest quote within the current regular session. A quote remains current until updated. Positions close at the opposite bid/ask 15 minutes before the stock session ends on expiry day, including shortened sessions.
The model reserves $0.65 per leg for entry and again for exit. This conservative fee estimate includes long options valued at zero with exercise waived; their price is marked with an asterisk.
Published data period: 2026-01-01 to 2026-10-16.
Displayed prices are historical quotes, not confirmed simultaneous fills. Commissions apply on entry and exit. Early assignment, stock delivery, intraday stops, and financing are not simulated. Risk at expiry is theoretical; quoted closing costs can exceed the spread width.
Data coverage: 0 entries; 0 closed; 0 still open; 0 missing an exit quote.
Skipped entry opportunities: 199 for market data or contract checks; 0 without an expiry in the selected window. Counts use the selected ticker, strategy and shape.
Trade by trade
| Timing, ET | Result, $ one option set |
Underlying, $ | Sold options | Bought options | Credit / debit per share; fees in $ |
Risk / contracts risk per set; qty at $1000 |
|---|---|---|---|---|---|---|
| 02 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 07 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 21 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 22 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 26 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 28 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 29 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 30 Jan 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 03 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 04 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 11 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 18 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 19 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 25 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 26 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 Feb 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 03 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 04 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 11 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 18 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 19 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 25 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 26 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 30 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 31 Mar 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 01 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 07 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 21 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 22 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 28 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 29 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 30 Apr 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 01 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 04 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 07 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 11 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 18 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 19 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 21 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 22 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 26 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 28 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 29 May 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 01 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 03 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 04 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 11 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 18 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 22 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 25 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 26 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 29 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 30 Jun 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 01 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 07 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 21 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 22 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 28 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 29 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 30 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 31 Jul 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 03 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 04 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 07 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 11 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 18 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 19 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 20 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 21 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 25 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 26 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 27 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 28 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 31 Aug 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 01 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 03 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 04 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 10 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 11 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 17 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 18 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 21 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 22 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 23 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 24 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 25 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 28 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 29 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 30 Sep 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 01 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 02 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 05 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 06 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 07 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 08 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 09 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 12 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 13 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 14 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 15 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
| 16 Oct 2026 |
Trade P&L—
Cum.—
| No trade: the strike grid cannot express the wing | ||||
How to read the table
Legs show strike and quoted entry → exit prices per share. Multiply net credit and debit by 100 for one contract. P&L subtracts commissions for both opening and closing every leg. The stress case reduces only the net entry credit; displayed leg quotes remain unchanged.
The cumulative column is measured through the exit date, including all trades closed that day. Rows sharing an exit date therefore share the same cumulative result. Open positions and missing exits have no known final P&L.